2024 works for London Borough of Camden in Pancras Sq. 

Colin Barber was commissioned to carry our complete renovation on a plunge-pool / spa pool in the Pancras Square leisure centre of Camden council. 

The works involved consultation and spec. - the removal of existing tile, then re-rendering and waterproof tanking the structure. A seat section was found to be failing so was re-formed in addition.

The 7 weeks of work was assisted by Camden facilities apprentice Shelby:  She was introduced to the field of tiling and proved her worth in assisting and actually fixing some areas - so contributing lasting work on a public asset in the her local area.